The general binding rules are the Environment Agency's standard conditions for small sewage discharges in England. If your septic tank or small sewage treatment plant meets them, you don't need an environmental permit. If it doesn't, you have to bring it into line, connect to the mains, or apply for a permit.
For most Herefordshire households this is less daunting than it sounds. What catches people out here is older tanks piped to a field ditch, soakaways silted up in clay, and properties close to the Wye or the Lugg. The primary source is gov.uk: Septic tanks and sewage treatment plants: what you need to do, with separate rule sets for discharges to the ground and discharges to surface water.
Who the rules apply to
The rules put the responsibility on the operator. You're the operator if you own the property the system serves, if you share a system with other properties (in which case responsibility is joint), or if an agreement such as a tenancy makes you responsible. Shared tanks are common where a Herefordshire farmhouse and its converted barns were sold off separately, so it's worth knowing who else has a stake in yours.
If you're on the public foul sewer, none of this applies. The rules are for England only; over the border in Wales, Natural Resources Wales sets the rules.
Existing and new discharges
Which rules you have to meet depends on when your discharge started and whether it has changed since. gov.uk splits discharges into three groups:
- Started before 1 January 2015: the baseline rules only.
- Started between 1 January 2015 and 1 October 2023: the baseline rules plus the 2015 additions.
- Started on or after 2 October 2023: all of the above plus the 2023 additions.
A discharge also counts as newer if it has since switched between ground and surface water, moved more than 10 metres, or increased in volume past the limit, which matters when you replace a system. The gov.uk pages on existing discharges and new discharges set out the tests.
The volume limits
- Discharge to ground: 2 cubic metres (2,000 litres) a day or less.
- Discharge to surface water: 5 cubic metres (5,000 litres) a day or less.
An ordinary family house sits well inside both. They start to matter where one system serves a cluster of barn conversions, a farmhouse with several holiday lets, or a small business.
Rules for a discharge to ground
The usual Herefordshire set-up: a tank or plant, then a drainage field.
- Only domestic sewage: toilet, bathroom, shower and kitchen waste from a house, flat or business such as a pub or office.
- The discharge mustn't pollute surface water or groundwater.
- Waste water must go to ground through a drainage field. A well, a borehole, or a rainwater-style soakaway installed after December 2007 doesn't meet the rules.
- A drainage mound is acceptable outside a floodplain if it meets the British Standard, which helps on heavy clay.
- A discharge point in groundwater Source Protection Zone 1 (except SPZ1c) needs a permit. SPZ1 includes land within 50 metres of a private water supply, so farms and cottages on wells or springs should check.
For discharges started from 2015 there are extra conditions. A single house can't rely on the rules if a public sewer is within 30 metres of its boundary. The discharge also can't be in ancient woodland, or in or within 50 metres of a special area of conservation, special protection area, Ramsar site or biological SSSI. The River Wye and River Lugg are both protected sites, so this can bite on riverside plots.
Rules for a discharge to surface water
- A septic tank can't discharge straight to a watercourse. You must use a small sewage treatment plant. A reedbed or conversion unit after a septic tank is only acceptable if it meets the relevant British Standard.
- If yours does, you must as soon as possible connect to the mains, replace it with a treatment plant, or add a drainage field, with plans in place usually within 12 months. See septic tank discharging to a ditch or stream.
For discharges started from 2015 there are further limits. The outlet can't go to a ditch or watercourse that doesn't flow all year round, except in drought. It can't go to an enclosed lake or pond. It can't be in or within 500 metres of a biological SSSI, special area of conservation, special protection area or Ramsar site, among others. Along much of the Wye and Lugg that 500-metre line means a new outlet to surface water needs a permit.
British Standards
Your system must meet the British Standard in force when it was installed: BS EN 12566 for tanks and plants, BS 6297:2007 for drainage fields and mounds. A CE mark, a certificate of compliance, or a listing on British Water's approved equipment list shows compliance. Systems installed before 1983 are exempt, and parts installed at different times each follow the standard of their own date.
Maintenance, emptying and records
- Keep the system maintained in line with the manufacturer's instructions, by someone competent. British Water keeps a list of accredited service technicians.
- Get it repaired or replaced if it isn't in good working order. Signs include leaks, cracked walls or pipes, blockages, water pooling around the outlet, sewage smells, and failed motors, pumps or electrics.
- Have the sludge removed before it goes beyond the tank's capacity. gov.uk says you should do this at least once a year, or as the manufacturer advises. See how often to empty a septic tank and septic tank emptying.
- Whoever takes the sludge away must be a registered waste carrier. Ask them to confirm it, or ask for a copy of the waste carrier certificate.
There's no formal logbook, but you'll need to hand over maintenance records, if you have them, when you sell, so keep receipts and service sheets together. On narrow lanes around the Golden Valley or Much Marcle, a note of where the tanker parked saves time next visit.
When you need a permit
You only need a permit if you can't meet the general binding rules, and you can only get one if connecting to the mains isn't reasonable. There's a quicker standard rules permit for lower-risk discharges and a bespoke permit for the rest. Operating without a permit when you need one is an offence. See find out if you need a permit.
Selling, and stopping using a system
When you sell, you must tell the new owner in writing that a sewage discharge is in place. If a septic tank discharges straight to a watercourse, buyer and seller should agree, as a condition of sale, who will put it right. See selling a house with a septic tank.
If you permanently stop using a system, you must remove anything that could cause pollution, such as remaining sludge. See decommissioning a septic tank.
For a quick check, try the do I need to upgrade? tool or book a septic tank survey. Back to the county overview.
Questions
Do I need to register my septic tank?
No. In England there has been no registration requirement since the general binding rules came in in 2015. If your system meets the rules you don't need a permit or to register it. You only deal with the Environment Agency if you can't meet the rules.
Is my old brick septic tank illegal?
Not in itself. A tank installed before 1983 is exempt from the British Standard requirement, but it still has to work, discharge to ground rather than a watercourse, and be emptied.
Does the general binding rules deadline of 2020 still apply?
The original rules gave septic tanks that discharge to watercourses until 1 January 2020 to be put right. The current gov.uk wording says it must be done as soon as possible, with plans in place usually within 12 months.
My tank drains to an old soakaway pit. Is that allowed?
A rainwater-style soakaway installed after December 2007 doesn't meet the rules. Older arrangements aren't ruled out by that condition, but the discharge still mustn't cause pollution. In Herefordshire clay, old soakaways often fail, so a survey is worthwhile. See drainage fields.
