Off-mains drainage is normal in rural Herefordshire. Buyers looking at a cottage near Fownhope or a farmhouse outside Weobley will usually expect a septic tank or treatment plant, and most sales go through without drama. Where they do stall, it's almost always for one of three reasons: nobody knows where the tank discharges, the paperwork is missing, or the tank turns out to be piped to a ditch.
This guide covers what the rules require of you as a seller, what the conveyancing process will ask, and how to get ahead of it.
What the rules require of a seller
Under the Environment Agency's general binding rules, when you sell you must tell the new operator in writing that a sewage discharge is in place. The gov.uk rules for discharges to the ground and discharges to surface water list what that written notice should include:
- a description of the treatment system and drainage system
- the location of the main parts: tank or plant, drainage field, and the discharge point
- details of any changes made to the system
- details of how the system should be maintained, and the maintenance manual for a treatment plant
- maintenance records, if you have them
A simple pack does the job: a sketch plan showing the tank, the inspection chambers and the drainage field; the make and model of any plant; emptying receipts; service sheets; and any building control certificate from when it was installed. Your conveyancer can attach it to the sale documents.
If the tank discharges to a ditch or stream
This is the point that matters most. A septic tank must not discharge directly to a watercourse. If yours does, gov.uk says you must, as soon as possible, connect to the mains, replace the tank with a small sewage treatment plant, or install a drainage field, with plans in place usually within 12 months.
When the rules were first introduced, there was a deadline of 1 January 2020, or earlier if the property was sold first. That's why estate agents still talk about a sale "triggering" an upgrade. The current wording puts the duty on the operator now, sale or no sale. On a sale, gov.uk says buyer and seller should agree who will be responsible for replacing or upgrading the system, and agree it as a condition of sale. See septic tank discharging to a ditch or stream for the options.
What the conveyancing will ask
Your solicitor will ask you to complete the Law Society's Property Information Form (TA6). Its drainage section asks whether the property uses a septic tank, a sewage treatment plant or a cesspool, and then goes into detail. When did the discharge start, and when was the system installed? When was it last replaced or upgraded? When was a cesspool last emptied, or a treatment plant last serviced? Does it discharge to the ground or to surface water? Is it shared with other properties? Is any part of it, or the access to it, outside your boundary? Answer from records where you can. If you don't know, say so rather than guess, because the buyer relies on your answers.
The buyer's drainage and water search will show that the property isn't on the public sewer, but it won't say anything about the condition of a private system. That gap is why buyers' solicitors so often ask for a survey.
Surveys
A buyer's homebuyer survey is unlikely to cover the tank in any depth. A dedicated septic tank survey usually involves emptying or dipping the tank, checking the structure and baffles, tracing the outlet (often with a dye test or drain camera), and walking the drainage field for wet ground or smells. It then says in writing whether the system appears to meet the general binding rules. What a septic survey involves goes through it step by step. A typical Herefordshire range is £250–£450, depending on access and whether the tank needs emptying first.
Some sellers commission their own survey before listing. It costs much the same as a buyer's survey, it lets you fix small problems on your own terms, and it gives the buyer something concrete rather than a question mark. If the report finds a ditch outlet, you know about it before the price is agreed, not three weeks before exchange.
Who pays for an upgrade
There is no rule saying the seller must pay. It is a matter for negotiation, and the usual outcomes are:
- The seller upgrades before completion. Cleanest for the buyer, but you carry the cost and the timing risk.
- A price reduction. The buyer takes on the work after completion. This is the most common route where the work is substantial.
- A retention. Part of the price is held back by the solicitors until the work is done. Useful when both sides want to proceed but the work can't be finished in time.
A buyer's mortgage lender may also want to know how the issue is being dealt with before releasing funds. For budgeting, a sewage treatment plant supply and install typically runs £6,000–£15,000 in Herefordshire, and a replacement drainage field £3,000–£8,000. See sewage treatment plant costs and septic tank replacement costs.
Timescales
A survey can usually be arranged quickly. An upgrade takes longer: choosing the system, a percolation test if a drainage field is involved, building regulations approval, and then the installation itself, which is typically several days on site. On the county's heavy clay, winter ground can be too wet to dig cleanly or to get a fair percolation result, so an upgrade planned for January may slip. If you are thinking of selling in spring, find out where the tank goes in autumn.
Farmhouses, barn conversions and holiday lets
Herefordshire's property stock throws up a few recurring complications:
- Shared systems. Where a farmhouse and its barns were split into separate homes, one tank often serves several. Every owner is jointly responsible as an operator. The buyer's solicitor will want to see rights to use, access and maintain the tank, and an agreement on how costs are shared.
- Tanks on someone else's land. The tank or drainage field for a cottage sometimes sits in a neighbouring field. Rights of drainage and access need to be documented.
- Holiday lets. A farmhouse with a couple of lets can push daily flows up in summer. The general binding rules cap discharges at 2 cubic metres a day to ground and 5 cubic metres a day to surface water, so a buyer planning to add lets should check the system's capacity. In the River Lugg catchment, a planning application for new letting units will also need to show nutrient neutrality. See Wye and Lugg phosphate.
- Old brick tanks. Common under period farmhouses. A tank installed before 1983 doesn't have to meet the British Standard, but it still has to work and be emptied, and it can't discharge to a watercourse.
For the wider rules, see the general binding rules, the regulations hub and the county overview.
Questions
Do I have to replace my septic tank before I sell?
Not automatically. If the tank meets the general binding rules, it can be sold as it is. If it discharges straight to a ditch or stream, it has to be put right, but who pays and when is for buyer and seller to agree as a condition of sale.
What if I don't know where my tank discharges?
Say so on the TA6 rather than guess, then find out. A survey will trace the outlet, often with a dye test, and tell you whether it goes to a drainage field or a watercourse.
Can I just lower the price instead of upgrading?
Yes, that's one of the most common outcomes. The buyer takes on the upgrade after completion and the price reflects it. Some buyers prefer a retention held by the solicitors instead.
Will the buyer's survey pick up a problem with the tank?
Probably not in detail. A standard homebuyer survey usually notes that the property has private drainage and recommends a separate check of the drainage. A dedicated septic tank survey is what answers the question.
Should I empty the tank before the sale?
It helps. An empty tank can be inspected properly, and a recent emptying receipt from a registered waste carrier is good evidence of maintenance. See septic tank emptying.