Tank overflowing or backing up? Call now 01432 667324
Coils of perforated land drainage pipe on site

Drainage fields and soakaways in Herefordshire

The drainage field is where septic tank effluent finishes its treatment, and on Herefordshire clay it is usually the first part of the system to fail. Here is how they work, how they are tested and what can be done when one stops draining.

£3,000–£8,000 typical Herefordshire range, not a quote

Get a quote

Free, no obligation. Takes about a minute.

What do you need?
How urgent?

Quotes are free. Your details are used to arrange your quote. Privacy notice.

Quick answer

A drainage field spreads septic tank effluent through perforated pipes in gravel trenches so the soil can finish treating it. Herefordshire's red clay, marl and high winter water tables make it the part most likely to fail. Laying a replacement field typically costs £3,000–£8,000, and percolation testing decides whether one is possible.

  • Typical cost: £3,000–£8,000 for a new field
  • Pass mark: Average Vp of 12–100
  • Main risk: Saturated floodplain ground near the rivers
  • Alternative: Treatment plant discharging to flowing water

A septic tank does only half the job. The soil of the drainage field does the rest. When the field works, you never think about it. When it fails, the tank backs up and the lawn goes soggy.

Soakaways versus drainage fields

A soakaway is a pit, often filled with rubble, designed to take rainwater. Many older Herefordshire tanks drain into one, concentrating effluent in a spot that soon clogs.

A drainage field (sometimes called an infiltration system) spreads effluent through a network of perforated pipes laid in shallow, gravel-filled trenches. Effluent soaks into a wide area of soil, where bacteria finish treating it.

This matters for compliance. Under the Environment Agency's general binding rules for discharges to ground, a system discharging to ground must use a drainage field (new ones to BS 6297:2007), and a soakaway installed after December 2007 does not meet the rules. The daily volume limit for a discharge to ground is 2 cubic metres. See general binding rules for the rest.

Percolation tests

Before a field is designed, the ground is tested. A trial hole comes first, to check the winter water table won't rise within a metre of the pipes. The percolation test in Approved Document H (BS 6297 is similar) then runs roughly like this:

  1. A hole 300 mm square is dug to 300 mm below where the distribution pipe will sit.
  2. It is filled with water and left to drain, to soak the surrounding soil.
  3. It is filled again, and the time taken for the water level to fall from 75% to 25% full is recorded.
  4. The test is done at least three times, using at least two holes. The time for the 150 mm fall, divided by 150, gives the percolation value, Vp, in seconds per millimetre, and the results are averaged.

The lower the Vp, the faster the ground drains. Approved Document H treats an average Vp between 12 and 100 as suitable for a drainage field; BS 6297 uses 15 to 100. Above 100, the ground is too slow and effluent will pond. Below 12, it drains so fast that effluent may reach groundwater before it is treated. Vp also sets trench length: the slower the ground, the bigger the field.

Test at the real depth and position, and not in drought or heavy rain, which Approved Document H rules out. Cracked summer clay flatters the result.

Why drainage fields fail in Herefordshire

Much of the county sits on Old Red Sandstone mudstones and siltstones that weather to heavy red clay and marl. In places they drain adequately, and river gravels drain better still. In many others, including much of the country around Hereford, Leominster and Bromyard, percolation tests often come back too slow for a drainage field. A field that barely passed a summer test can be overwhelmed every winter.

Groundwater is the second problem. On the floodplains of the Wye, Lugg, Frome, Arrow and Monnow, the water table can rise to within a few hundred millimetres of the surface in wet months. A drainage field sitting in saturated ground cannot drain at all. Low-lying parts of Hereford, Ross-on-Wye and the Lugg valley are the classic cases.

Age does the rest. Old fields behind farmhouses and cottages were often too short for modern water use, and solids from a tank emptied too rarely seal the trench base. Roots, vehicle compaction and collapsed pipes finish them off.

Signs a drainage field is failing

  • Wet, spongy ground or standing water over the field, especially after rain
  • Unusually green, lush strips of grass along the trench lines
  • Sewage smells in the garden
  • The septic tank filling quickly after emptying, or the level sitting high
  • Toilets and sinks draining slowly, gurgling drains
  • Effluent appearing in a nearby ditch

The drainage field failure guide covers diagnosis in more detail.

Options when a field fails

Relay the field. A new drainage field on fresh ground, correctly sized from a percolation test. If it stays within 10 metres of the old discharge point, it may still count as an existing discharge; move it further and it is treated as new.

Extend the field. Where the ground is reasonable but the field too small, more trench length can help.

Raised or mound systems. Where the water table is high, a drainage field can be built up in imported material above natural ground level. It takes space, and under the general binding rules it must follow BS 6297 and can't be in a floodplain.

Upgrade to a treatment plant. Often the best answer on heavy clay. A sewage treatment plant produces cleaner effluent that, where the rules allow, can discharge to a ditch or stream that flows all year, doing away with the need for a large drainage field.

Always rule out the cheap fixes first. A tank that has not been emptied for years, or a broken baffle letting solids through, can mimic a failed field. Septic tank repairs cover those.

Costs

Replacing a drainage field typically costs £3,000–£8,000 in Herefordshire, depending on field size, ground conditions, access for machinery and how much spoil has to go. A full septic tank and field replacement is more; see the septic tank replacement cost page. For everything else, see septic and treatment plant services across Herefordshire.

Questions

Can a failed drainage field be unblocked?

Sometimes jetting clears blocked pipes, but where the soil itself has clogged or the water table is high, cleaning the pipes will not fix it. The field usually needs relaying or replacing with a different system.

How long does a drainage field last?

It varies widely with ground, design and how well the tank is looked after. On free-draining soil a well-maintained field can last for decades. On heavy clay, far less.

What is a good percolation test result?

Under Approved Document H, an average Vp between 12 and 100 seconds per millimetre is suitable for a drainage field (BS 6297 says 15 to 100). Results above 100 mean the ground is too slow.

Is my soakaway illegal?

Not necessarily. A soakaway installed before 2008 may still be acceptable if it causes no pollution and the other rules are met. One installed after December 2007 does not meet the general binding rules, and any soakaway that is causing pollution needs dealing with.

Facts checked 29 September 2026 against the official sources linked on this page.

Get a septic tank quote

Emptying, repairs, treatment plants and surveys across Herefordshire. Quotes are free.