Sewage treatment plants in Bromyard and the Lugg catchment

Bromyard sits inside the River Lugg catchment, so a treatment plant here is tied closely to the council's phosphate guidance whenever planning is involved. Quotes are free.

£6,000–£15,000 typical Herefordshire range, not a quote

Get a quote

Free, no obligation. Takes about a minute.

What do you need?
How urgent?

Quotes are free. Your details are used to arrange your quote. Privacy notice.

Quick answer

Water from Bromyard runs via the Frome into the Lugg, so a treatment plant here gets tied up with nutrient neutrality whenever planning is involved, such as a hop kiln conversion or a new let. A straight swap on an existing house is judged on the general binding rules instead. Supply and installation is typically £6,000–£15,000.

  • Typical cost: £6,000–£15,000; planning costs extra
  • Catchment: Upper Frome, inside the Lugg area
  • Ground: Hard sandstone bands in red mudstone
  • Sloping sites: A pump chamber may be needed

Bromyard drains to the River Frome, and the Frome joins the Lugg at Hampton Bishop. Herefordshire Council's catchment maps put the town inside the River Lugg nutrient neutrality area, in the sub-catchment labelled Upper Frome. For a treatment plant, that matters most when a planning application is involved: a barn or hop kiln conversion, a new holiday let or a new house. For the town and its villages in general, see septic tanks around Bromyard.

Replacing a septic tank with no change of use

If you're swapping a septic tank for a plant on the same house, with no extra homes, nutrient neutrality isn't what decides it. The Environment Agency's general binding rules are. A septic tank that runs to a ditch has to be put right, and a plant is one of the ways to do it. See discharge to a ditch or stream.

The council's interim guidance on package treatment plants in the Lugg catchment adds a few points worth knowing even here:

  • a like-for-like replacement of an old septic tank or plant, with no more homes, is one of the cases the guidance treats as nutrient neutral
  • where the old system discharged to ground, only a new system that also discharges to ground will be accepted, backed by evidence the ground is suitable
  • where the old system discharged to a watercourse, the new one can go to ground or to a watercourse
  • an upgrade of a working, legal septic tank may count as a betterment usable as nutrient credits, but an upgrade of a failing or non-legal system won't

Conversions, lets and new homes

Add a dwelling or overnight accommodation and the application has to show nutrient neutrality. The council's two main routes are phosphate credits, where credits from its Luston wetland can be used anywhere in the Lugg catchment, or a private mitigation scheme.

A small new plant discharging to ground can sometimes be screened out as a small-scale impact. The interim guidance sets out Natural England's tests for flows under 2 cubic metres a day. All of them have to be met, including:

  • the drainage field is more than 40 metres from any ditch, drain or watercourse
  • the slope is no greater than 15%
  • the winter water table stays at least 2 metres below the surface
  • the field isn't in flood zone 2 or 3
  • the discharge is at least 200 metres from any other discharge to ground

Around Bromyard those tests are hard to pass. The land is cut by steep-sided valleys, and in a cluster of converted farm buildings the next discharge is often close by. Plan for credits or mitigation unless a site survey shows otherwise.

Does a plant cut phosphorus?

Not by as much as people expect. Where no tested figure is available, the council's guidance uses Natural England's default phosphorus concentrations: 11.6 mg/l for a septic tank and 9.7 mg/l for a package treatment plant.

Chemical dosing can strip more phosphorus, but the guidance is cautious. Dosing should only be proposed where it can be robustly justified. It must use ferric (iron) salts, not aluminium. It needs a management plan and a service agreement with accredited professionals, secured for the lifetime of the development. The council warns those costs may be prohibitive for smaller schemes. Ask for the manufacturer's tested phosphorus result before choosing; the choosing a treatment plant guide covers what else to compare.

Ground, slope and flooding

The bedrock around Bromyard is the St Maughans Formation, which the British Geological Survey describes as interbedded sandstones and red mudstones. A plant excavation can hit a hard sandstone band partway down, which slows the dig.

On sloping sites the plant has to sit low enough for the house drains to reach it by gravity, but high enough that the outlet can still fall to its drainage field or ditch. Where both can't be done, a pump chamber is added. Close to the Frome, the Environment Agency runs a flood warning area for the river at Bromyard, so a plant on low ground needs anchoring, with lids and vents above likely flood level. A plant also needs a permanent electricity supply for its blower or motor.

What a plant costs around Bromyard

Supply and installation of a domestic plant typically runs £6,000–£15,000 in Herefordshire. It's a guide, not a quote. Around Bromyard the figure moves with:

  • rock in the excavation and the depth needed on a slope
  • a pump chamber where gravity won't work
  • the outfall length to a drainage field or ditch
  • a dosing unit and its servicing, if one is needed
  • digger access down narrow lanes into the valleys

Planning costs for a conversion, such as credits and drainage reports, sit on top. See sewage treatment plant cost, sewage treatment plant installation and sewage treatment plants across Herefordshire. The Wye and Lugg phosphate page explains the wider position.

Questions

Can I replace my septic tank near Bromyard without buying phosphate credits?

Usually, yes, if it's a straight replacement on the same house with no extra homes. The council's interim guidance treats that as nutrient neutral. The new system still has to meet the general binding rules.

Why might a sloping garden near Bromyard rule out the small-scale route?

One of Natural England's small-scale tests is a slope no greater than 15%. Many gardens and paddocks around Bromyard are steeper, so a new drainage field there usually needs credits or other mitigation instead.

Will a phosphate-dosing plant be accepted for a Bromyard conversion?

Only with a strong case. The council wants evidence that a non-dosing plant won't work, ferric rather than aluminium dosing, and a service agreement secured for the life of the development.

Does a treatment plant on the WR6 side of Bromyard face the same planning tests?